Accomplishments for week 9:
- Altered node move up/down operations to retain their children (instead of
abandoning to siblings).
- Implemented double click flipping between the Mapper and Wireframer.
- Met with BlinkIA and delivered final prototype system.
- Drafted list of remaining improvements/additions to the Sphinx system with
time and cost estimations; sent to BlinkIA.
Objectives for week 10:
- Refine double-click switching to Wireframer.
- Make Mapper draw tree in bounds of the drawing window.
- Contribute to writing of project deliverables.
- Attend the Software Fair and demonstrate project.
Issues/Bugs
- Stress of the end-of-quarter crunch.